| Design and Access Statement | Download | 
		
			| Environmental Statement – Non Technical Summary | Download | 
		
			| Environmental Statement – Cover Page and Technical Summary | Download | 
		
			| Environmental Statement – Chapter 1 – Introduction | Download | 
		
			| Environmental Statement – Chapter 2 – Key Environmental Aspects + Assessment Methodology | Download | 
		
			| Environmental Statement – Chapter 3 – Need and Alternatives | Download | 
		
			| Environmental Statement – Chapter 4 – Description of the Development | Download | 
		
			| Environmental Statement – Chapter 5 – Existing Environment | Download | 
		
			| Environmental Statement – Chapter 6 – Air Quality | Download | 
		
			| Environmental Statement – Chapter 7 – SocioEcomomic | Download | 
		
			| Environmental Statement – Chapter 8 – Highways and Transportation | Download | 
		
			| Environmental Statement – Chapter 9 – Landscape | Download | 
		
			| Environmental Statement – Chapter 10 – Ecology | Download | 
		
			| Environmental Statement – Chapter 11 – The Water Environment | Download | 
		
			| Environmental Statement – Chapter 12 – Archaeology and Heritage | Download | 
		
			| Environmental Statement – Chapter 13 – Geotechnical | Download | 
		
			| Environmental Statement – Chapter 14 – Noise and Vibration | Download | 
		
			| Environmental Statement – Chapter 15 – Overall Health Impact | Download | 
		
			| Environmental Statement – Chapter 16 – Cumulative Impacts and Mitigation Summary | Download | 
		
			| Pre-Application Consultation Report | Download | 
		
			| Shadow Habitats Regulation Assessment | Download | 
		
			| Site Plan & Drawings – DNS Application Boundary | Download | 
		
			| Site Plan & Drawings – Drawings to Describe the Development | Download | 
		
			| Site Plan & Drawings – Location Plan | Download | 
		
			| Waste Planning Statement | Download | 
		
			| Link to Buttington Quarry ERF on Planning Inspectorate Website | Link |